Unit 4 / P1 Drawing Coordination

4951 Yonge Street · Interactive layered view · No core locations shown

R2 · 07 OCT 2026
Alignment requires confirmation. A0.2 is NTS. A preliminary four-lift-shaft alignment still produces a discrepancy at Stair C. The Unit 4 projection is a review overlay, not a confirmed room boundary or drilling clearance.
Loading source drawings…
Drag to rotate · Scroll to zoom
Right-drag to pan · Two fingers to zoom
X. Zhang designer identification stamp
Preliminary Unit 4 footprintER-01ER-02Stair C / lift shafts
Drawing comparison only. The vertical gap and cutaway wall heights are display conventions, not surveyed elevations. No hole locations, safe drilling zones, structural approval or clash-free conclusion are provided. The designer identification stamp does not certify the unverified alignment.
R2 replaces the earlier schematic room, beam and column layout. Confirmed source content and unresolved cross-floor registration are kept separate.